-
Direct defences, including 1.5 km of flood embankments and flood walls;
-
Upgrades to existing surface water drainage system including the Denburn Culvert;
-
The installation of three submerged pump stations; and
-
Ecological enhancements in the Inch Park.
This site has no pictures.
Be the first who adds one.
Brechin Flood Protection Scheme
¿Dónde?
|