Brechin Flood Protection Scheme

Loading...

The Brechin Flood Prevention Scheme includes:

  • Direct defences, including 1.5 km of flood embankments and flood walls;
  • Upgrades to existing surface water drainage system including the Denburn Culvert;
  • The installation of three submerged pump stations; and
  • Ecological enhancements in the Inch Park. 

More information:  09. Brechin Flood Protection Scheme | River South Esk Catchment Partnership


This map shows nature‑based solution projects that support climate change adaptation in the Tayside region. For this work, we use the NatureScot definition of nature‑based solutions (see: https://www.nature.scot/climate-change/nature-based-solutions).

Où?


rapporter un problème
|
proposer une photo
[16, 6, 1, 6]
[]
[]
[]
[]
[]
[]
[]
[]
[10, 6]
[10, 10]
[10, 20]
[10, 30]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]