Climate Ready Clyde project pipeline
sites
Allanton
village in North Lanarkshire experiences surface water flooding risks
associated with legacy mining impacts, ferruginous (iron-rich) groundwater, and
altered hydrology. Residential properties...
Hydrological and hydraulic modelling
to assess the feasibility and optimal design of a naturalised wetland in
Redmire Park, adjacent to Allanton Primary School and Kings Hill Nature Reserve. The...
Design of a new urban park adjacent to a remodelled community facility. Additional funding would be used to run engagement activities so that local people understand the importance of climate-rea...
Part of the GCC Park Ponds project. GCC is working with
greenspace scotland and others to look develop opportunities for nature-based
surface water management to replace failing drainage networks in p...
Part of the GCC Park Ponds project. GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in p...
Park of the GCC Park Ponds project. GCC is working with
greenspace scotland and others to look develop opportunities for nature-based
surface water management to replace failing drainage networks in p...
GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in parks and open spaces to address surf...
The
project involves transforming disused tennis courts into a wildflower meadow
for pollinators and to improve water retention as well as planting avenues of
trees to enhance and strengthen the woodl...
Design and installation of living
roofs on bin shelters at University of Glasgow’s Gilmorehill Campus in Glasgow
City. This demonstration project aims to
raise awareness among students a...
Installation of a Raingarden Parklet, an innovative
nature-based solution designed to manage surface water while transforming an
area the size of single car parking space into a vibrant, educational, ...
GCC wide initiative - a Property Flood Resilience (PFR) pilot to grant fund residential and business property owners to invest in PFR measures, a key adaptation intervention for properties at ris...
Installation
of PFP measures to protect 3 residential terraced properties in an area of
climate vulnerability and at high risk of flooding due to proximity to a
watercourse
Removing constraints that slow the rate that the existing road gully network can drain surface water into the combined sewer when capacity is available.