Climate Ready Clyde project pipeline

Partner projects and priorities from 2025-2030

Show map

one contributor

13 published sites

sites

placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Allanton village in North Lanarkshire experiences surface water flooding risks associated with legacy mining impacts, ferruginous (iron-rich) groundwater, and altered hydrology. Residential properties...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Hydrological and hydraulic modelling to assess the feasibility and optimal design of a naturalised wetland in Redmire Park, adjacent to Allanton Primary School and Kings Hill Nature Reserve.  The...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Design of a new urban park adjacent to a remodelled community facility. Additional funding would be used to run engagement activities so that local people understand the importance of climate-rea...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Part of the GCC Park Ponds project. GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in p...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Part of the GCC Park Ponds project. GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in p...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Park of the GCC Park Ponds project. GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in p...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
GCC is working with greenspace scotland and others to look develop opportunities for nature-based surface water management to replace failing drainage networks in parks and open spaces to address surf...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
The project involves transforming disused tennis courts into a wildflower meadow for pollinators and to improve water retention as well as planting avenues of trees to enhance and strengthen the woodl...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Design and installation of living roofs on bin shelters at University of Glasgow’s Gilmorehill Campus in Glasgow City.    This demonstration project aims to raise awareness among students a...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Installation of a Raingarden Parklet, an innovative nature-based solution designed to manage surface water while transforming an area the size of single car parking space into a vibrant, educational, ...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
GCC wide initiative - a Property Flood Resilience (PFR) pilot to grant fund residential and business property owners to invest in PFR measures, a key adaptation intervention for properties at ris...
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Installation of PFP measures to protect 3 residential terraced properties in an area of climate vulnerability and at high risk of flooding due to proximity to a watercourse 
placeholder
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Removing constraints that slow the rate that the existing road gully network can drain surface water into the combined sewer when capacity is available.
[16, 6, 1, 6]
[]
[]
[]
[]
[]
[]
[]
[]
[10, 6]
[10, 10]
[10, 20]
[10, 30]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]
[]